The peptide tracker that keeps you on schedule.

Peppy is a peptide tracker app and GLP-1 tracker for iPhone. It logs the dose your provider gave you*, reminds you when it is due, and keeps your vials, injection sites and progress in one private place.

Peppy peptide tracker app Home screen: a countdown to the next dose, with today's doses and a low vial below
peptides and blends in the library
45
syringe sizes, in mg or mcg
4
Home and Lock Screen widgets
5
accounts to create
0
What it does

A peptide tracker, GLP-1 tracker and reminder app in one.

Six jobs that used to live in a notes app, a spreadsheet and your memory, done in one peptide tracker app.

Set up

Your vial and your dose, set up in a minute.

Enter the vial strength, the bacteriostatic water and the dose your provider gave you. Picking a peptide from the library may pre-fill common starting values as placeholders to save typing; they are not recommendations, so check and change them to match what your provider gave you. Peppy shows your dose in the units on your syringe*, and flags a number that cannot be right, like a dose the syringe cannot hold.

How to enter your vial and dose
  • Powder you mix, or pre-mixed vials
  • Doses in mg or mcg
  • 0.3, 0.5, 1 and 3 mL syringes
Setting up a peptide in Peppy: a 5 mg vial mixed with 2 mL of water, and the entered 0.25 mg dose shown on the syringe
Reminders

A nudge when a dose is due.

Reminders are set from your schedule the moment you save it. Peppy also tells you when a vial is running low or about to expire, and when a titration step is coming up.

Learn more
Three Peppy notifications: a dose that is due, a dose coming up tomorrow, and a vial running low
Stash

Know what is left in every vial.

Each vial shows how much is in it, how many doses that makes and roughly how long it will last.

Learn more
A semaglutide vial with 1.8 mL remaining, 9 doses left and a runway of more than three weeks
Injection sites

Rotate sites without thinking about it.

Tap where you injected. Peppy remembers every site across all your peptides, shows which ones have rested and suggests where to go next.

Learn more
Logging a dose: a body map with used sites marked and the next rested site suggested
Progress

See where it is going.

Log your weight and watch the trend against your goal. Drag across the chart to read any weigh-in.

Learn more
A weight chart falling from 195 lb to 175 lb, with a goal of 159 lb
Dose history

A record you can bring to an appointment.

Every dose, weigh-in and side-effect check-in lands on one calendar, with what was logged, what was missed and how often you were on time.

Learn more
The Track calendar: a week of logged doses, 13 doses logged, none missed, 100% on time
  • Titration ladders
  • On and off cycles
  • Home and Lock Screen widgets
  • Missed-dose catch-up
  • Powder or pre-mixed vials

Every feature, one page each, including titration ladders and cycles.

How it works

Set up once. Then just show up.

  1. 01

    Pick your peptide

    Choose from the library or add your own, as powder you reconstitute or as a pre-mixed vial.

  2. 02

    Enter your vial and dose

    Give Peppy the vial strength, the water you added and the dose your provider gave you. It shows that dose in the units on your syringe* and builds the schedule.

  3. 03

    Log each dose in a tap

    Peppy reminds you when a dose is due, suggests a rested injection site and keeps the history for you.

Setting up a peptide in Peppy: vial, dose and a weekly schedule with a reminder time
Privacy

What you track in Peppy stays with you.

Peppy has no servers holding your health data, because it was built not to need any.

Read the Privacy Policy
  • No account, no sign-up

    Open the app and start. There is no profile to create and nothing to log in to.

  • Stored on your iPhone

    Your peptides, doses, weight and side effects are saved on the device itself.

  • Backed up to your own iCloud

    If you are signed in to iCloud, a copy is kept in your private iCloud account. We cannot read it.

  • Analytics without health data

    We collect anonymous usage analytics to improve the app. They never include what you track.

Questions

Peptide tracker questions, answered.

Every question on one page, the steps in the help centre, or write to support.

Peppy is a peptide tracker app and GLP-1 tracker for iPhone. You enter your vial, the water you mixed it with and the dose your provider gave you. Peppy shows that dose in the units on your syringe, reminds you when each dose is due, counts down what is left in the vial, and keeps a history of your doses, injection sites, weight and side effects.* Read more.

Enter the vial strength in mg, the bacteriostatic water you added in mL and the dose your provider gave you, in mg or mcg. Picking a peptide from the library may pre-fill common starting values as placeholders to save typing; they are not recommendations, so check and change them to match what your provider gave you. Peppy shows that dose on a 0.3, 0.5, 1 or 3 mL syringe so you can draw it, and warns if a number cannot be right, like a dose the syringe cannot hold. It works for powder you mix yourself and for pre-mixed vials.* See the steps.

No. Peppy never recommends a peptide, a dose or a schedule. It records and tracks the numbers you give it, for your own organization. It is not medical advice, and every dose should be confirmed with a licensed healthcare provider. Read more.

The peptide library holds 45 peptides and blends across metabolic, growth, recovery, longevity and other categories, and you can add anything else as a custom entry. Powder you reconstitute and pre-mixed liquid are both handled. Read more.

Yes. A GLP-1 peptide such as semaglutide or tirzepatide is tracked like any other peptide in Peppy: enter the vial and the dose your provider gave you, and Peppy reminds you when each dose is due, counts down what is left in the vial, rotates your injection sites and charts your weight against your goal. It works for powder you reconstitute and for pre-mixed vials, and anything not in the library can be added as a custom entry.* See the GLP-1 tracker.

Yes. Keep one fixed dose, or build a ladder of steps and Peppy tells you when the next step is due. You can also give a protocol an end date or an on and off cycle. See how it works.

Your entries are stored on your iPhone and, if you are signed in to iCloud, backed up to your own private iCloud account, which we cannot read. There is no account and no sign-up. We do collect anonymous usage analytics to improve the app; they never include your peptides, doses, weight or symptoms. Read more.

Peppy is free to start: the free version covers one peptide with its reminders and dose log. Peppy Premium adds unlimited peptides, the full Track history and Progress, with a 7-day free trial and then $39.99 a year (US App Store price). You can cancel at any time in your App Store settings. See pricing.

Peppy is made for iPhone and needs iOS 17 or later. It includes Home Screen and Lock Screen widgets. Read more.

Everything you enter belongs to you and stays under your control: delete entries in the app, remove the app, and clear its iCloud backup from your iPhone's Settings. See the steps.

Start with your next dose.

Download Peppy, the peptide tracker app for iPhone. No account, and nothing to sign up for.